Quoi de neuf?

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

 
Syndicate content
 
juin 22 2017

Storm Sewer Connection in Cedarvale Park

What Work is Taking Place?

In preparation for the construction of Cedarvale Station, several storm and sanitary sewers must be reconfigured prior to the commencement of the support of excavation works. As part of one of these relocations, an existing connection must be enabled in one of the storm sewers at Cedarvale Park.

Crews will occupy a small portion of the park in the vicinity of an existing manhole (see picture below) in order to conduct the works.

Timing Lire la suite »

juin 22 2017

Shoring and Utility Work in the Roadway at Mount Pleasant Station

ORIGINAL ISSUE DATE: June 1, 2017

UPDATE: June 22, 2017
Crews will move into Stage 2 configuration as early as June 27, 2017.

 

What Work is Taking Place?

As early as June 2017, crews will begin shoring of the station box in the roadway, starting on the north side of Eglinton Avenue East.   Lire la suite »

juin 19 2017

Enbridge Gas Distribution Line Relocation Victoria Park Avenue & Eglinton Avenue East

What Work is Taking Place? 

Enbridge Gas Distribution (Enbridge) is relocating a gas main in the Eglinton Crosstown LRT corridor on Eglinton Avenue East between Victoria Park Avenue and Saddle Ridge Drive. 

Timing

  • Work will start at the end of June 2017 and will last for approximately four weeks.
  • Work will occur between 7:00 a.m. and 5:30 p.m., Monday to Friday.
  • Work could be rescheduled due to weather conditions or any unforeseen circumstances.
Lire la suite »

juin 09 2017

UPDATE: Cedarvale Station Support of Excavation

Original issue date: March 14, 2017
Re-issue date: June 9, 2017

UPDATE: Cedarvale Station Support of Excavation

By the end of 2015, tunneling works in the vicinity of Allen Road had concluded. Throughout 2016 and the beginning of 2017, crews conducted preparatory works for the future Cedarvale Station construction. Lire la suite »

juin 09 2017

Preparatory Road Works on Eglinton Avenue East for Surface Stops

Preparatory Road Works on Eglinton Avenue East for Surface Stops

The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.

Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located.  Lire la suite »

mai 24 2017

Drill Move at Mount Pleasant Station

What Work is Taking Place?

On Thursday May 25, crews will move the drill rig located at the Main Entrance east to the Secondary Entrance.  The drill rig will exit the Main Entrance and travel in reverse along Eglinton Avenue East, crossing Mt. Pleasant Road, over to the Secondary Entrance.  Additionally, a crane will lift equipment onto a truck to be transported to the Secondary Entrance.

Timing Lire la suite »

mai 24 2017

Drill Move at Mount Pleasant Station

What Work is Taking Place?

On Thursday May 25, crews will move the drill rig located at the Main Entrance east to the Secondary Entrance.  The drill rig will exit the Main Entrance and travel in reverse along Eglinton Avenue East, crossing Mt. Pleasant Road, over to the Secondary Entrance.  Additionally, a crane will lift equipment onto a truck to be transported to the Secondary Entrance.

Timing Lire la suite »

mai 24 2017

Upcoming Hydro Utility Relocation around Mount Pleasant Station

What Work is Taking Place?

To prepare for the construction of Mount Pleasant Station, crews will relocate and upgrade existing overhead hydro utilities in the vicinity of Mount Pleasant Road and Eglinton Avenue East for approximately eight weeks.  Lire la suite »

mai 10 2017

Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017

What Work is Taking Place?

As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Lire la suite »