What's New?
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
Drill Move at Forest Hill Station
What Work is Taking Place?
On Thursday, August 10, crews will move the drill rig located at the Secondary Entrance east to the Main Entrance in advance of piling at the Main Entrance. The drill rig will exit the Secondary Entrance and travel east along Eglinton Avenue West, crossing Bathurst Street, over to the Main Entrance located on the northeast corner of Eglinton Avenue and Bathurst Street.
During the move, traffic at the intersection will be stopped for approximately 15 minutes. Lire la suite »
Avenue Station Secondary Entrance Sound Wall
Original Issue Date: July 6, 2017
Re-issue Date: August 10, 2017
What Work is Happening?
Starting as early as Friday, August 11, work will begin to construct a sound barrier wall at the north side of the secondary entrance. This wall is engineered for maximum sound reduction and will be in place until construction of the station nears completion.
Hours of Work/ What to Expect Lire la suite »
Overnight Preparatory Works for Sewer Lining at Avenue Station
Overnight Preparatory Works for Sewer Lining at Avenue Station
In advance of upcoming mining works at Avenue Station, crews must install sewer linings to the existing sewer infrastructure in the vicinity of the station on Eglinton Avenue West between Braemar Avenue and Lascelles Boulevard. Work also includes one location at Avenue Road and Burnaby Boulevard, as well as one location on Highbourne Road and one on Oriole Parkway. Lire la suite »
Tree Removal at Chaplin Station Main Entrance Site
In early 2016, trees and shrubs in the former Chaplin Parkette were cleared to make way for station construction.
An additional tree, located in the Main Entrance area, is required for removal as early as the week of August 7.
Upon completion of station construction, new trees will be planted forming the new Chaplin Parkette.
Stay Informed Lire la suite »
Early Morning Concrete Pour at Cedarvale Station
What Work is Taking Place? Lire la suite »
Shoring and Utility Work in the Roadway at Mount Pleasant Station
ORIGINAL ISSUE DATE: June 1, 2017
Updated: June 22, 2017
UPDATE: July 26, 2017
What Work is Taking Place?
In June 2017, crews began shoring of the station box in the roadway, starting on the north side of Eglinton Avenue East.
Shoring is a common step in the process of constructing the foundation of a building. Steel piles, as well as braces and tie-backs, will be installed around the perimeter of the station box to support excavation. Lire la suite »
Update: Gas Main Support at Laird Station
To prepare for upcoming mining operations at Laird Station, micro piles will be drilled to the north of the Laird Station Secondary entrance. Micro piles will support local gas mains during mining.
Hours of Work/ What to Expect Lire la suite »
Overnight Watermain Investigations near Avenue Station
What Work is Happening?
To prepare for upcoming mining works at Avenue Station, a careful inspection of watermains in the area is required.
Crews will complete water leakage detection for the watermains in the vicinity of the future station box. The scope of work includes testing watermains and associated fittings on Eglinton Avenue West between Avenue Road and Lascelles Blvd. Lire la suite »
Cedarvale Station: Road Closures for Utility Relocation & Support of Excavation
What Work is Taking Place?
In June 2017, the Cedarvale Station work zones are now in full swing as crews complete tunnel concrete pours, utility relocation, and support of excavation activities.
To continue to relocate and upgrade storm and sanitary sewer infrastructure and complete support of excavation, traffic changes in the vicinity of Cedarvale Station are required.
Throughout the Summer 2017, the following roads will be closed at Eglinton Avenue West: Lire la suite »