Bell Utility Relocations at Leaside Station

What Work is Taking Place?

To complete the Bell Relocation works currently underway on the southwest corner of Bayview Avenue and Eglinton Avenue East, crews will extend the work zone into the intersection on the south side of Eglinton Ave East.

Stage 2 for Bell Utility Relocations

Timing Lire la suite »

décembre 192016

Shoring at Leaside Station

What Work is Taking Place?

Beginning in early-January 2017, and pending permit approval, crews will start support of excavation work, also known as shoring, at the future Leaside Station. The station is located at the intersection of Bayview Avenue and Eglinton Avenue East, with the main station entrance on the southeast corner and the secondary entrance on the northwest corner. Steel piles as well as braces and tie-backs will be installed around the perimeter of the station box and entrances to support excavation.  Lire la suite »

décembre 092016

Update: Maintenance Work at Cross Passage 11

What work is Taking Place? 

Crews will perform maintenance on the dewatering wells for Cross Passage 11.  Dewatering wells are required for cross passage construction to ensure that the water table remains low enough to allow for hand mining work to be completed.

Hours of Work Lire la suite »

novembre 282016

One Day Road Closure: Roehampton Avenue

What Work is Taking Place?

A large crane is required to replace hydro poles on the east end of Roehampton Avenue. Safe crane operation near hydro lines necessitates the road closure.

Timing Lire la suite »

octobre 242016

Overhead Hydro Work Continues for Leaside Station

What Work is Happening?

Since September 2016, crews have been completing overhead hydro relocations around the Bayview Avenue and Eglinton Avenue intersection. As early as the week of October 24, crews will be replacing overhead wires and anchors on the south side of Eglinton Avenue East at Bessborough Drive.

Impacts for School Lire la suite »

octobre 202016

Telecom Relocation for Leaside Station

What Work is Taking Place?

Crews will relocate existing telecommunications utilities from overhead to underground around the Eglinton Avenue and Bayview Avenue intersection. For the safety of the public and workers, temporary pedestrian and traffic changes will be in effect to accommodate this work. Lire la suite »

septembre 212016

Monitoring Instrument Installation for Leaside (Bayview) Station

What Work is Taking Place?

  • As part of the preparatory works for the future Leaside Station construction, installation of above ground and in-ground monitoring points will take place in the vicinity of Eglinton Avenue East and Bayview Avenue. These monitors will provide information on ground conditions during station construction.

Timing Lire la suite »

septembre 062016

Pedestrian Safety near Construction Sites

Construction of the Eglinton Crosstown LRT line, including 15 underground stations, is underway. Since the end of school, many construction sites have been set up for station construction and the set-up of some major intersections along Eglinton Avenue has been changed.

Pedestrian Information Lire la suite »

août 292016

Bell Utility Relocations at Leaside Station

What work is taking place? 

  • To prepare for future construction of Leaside Station, crews will complete substantial utility relocations around the intersection at Eglinton Avenue East and Bayview Avenue.
  • The first stage of utility relocations includes relocation of existing underground Bell utilities.

Timing Lire la suite »

août 292016

Hydro Utility Relocation for Leaside Station

What work is taking place? 

Crews will relocate and upgrade existing overhead hydro utilities on side streets around the Eglinton Avenue and Bayview Avenue intersection. Once relocated, outages will be required to switch services to the new infrastructure. Outage impacts will be communicated separately only to those directly impacted by the outages.