Dufferin Street

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

Syndiquer le contenu
 
mai 162017

Shoring and Utilities Relocation in the Roadway at Fairbank Station

 

What work is taking Place?

Since fall 2016, crews have been conducting support of excavation work (also known as shoring) at the Main Entrance and Service Building sites of the future Fairbank Station.  In mid-May 2017, crews will begin shoring of the station box, as well as wet utilities relocation, starting on the north side of Eglinton Avenue East.  Lire la suite »

avril 072017

Fairbank and Oakwood Stations Open House

Thank you for attending our Fairbank and Oakwood Stations Open House on April 6, 2017.

For those of you who missed it, the presentation is here:

Lire la suite »

avril 032017

Traffic Signal Hanging at Fairbank Station

What Work is Taking Place?

To make way for station construction, crews must relocate and hang the existing traffic signals at Dufferin Street and Eglinton Avenue West.  Traffic signal relocation will take place over five days, with curbside lane closures throughout the intersection.  Crews will install temporary traffic poles and signals at each corner of the intersection.  The temporary traffic signals and cables will be hung overhead, while the existing traffic poles are removed. Lire la suite »

mars 312017

LOW WATER PRESSURE NOTICE: Watermain Investigation Work

What Work is Taking Place?

On April 3, 2017, crews will begin subsurface utility engineering (SUE) investigation of a large 900mm watermain in the Eglinton Avenue West and Chaplin Crescent area.  The watermain will be exposed to determine the utility and ground conditions in advance of wet utilities relocation.  Most of the work will take place within the existing traffic staging at Chaplin Crescent and Eglinton Avenue West. Lire la suite »

mars 292017

Watermain Service Work at Fairbank Station

What Work is Taking Place?

Beginning the week of March 27, crews will be conducting watermain service work at the north end of Vaughan Road, south of the Main Entrance site at the southeast corner of Dufferin Street and Eglinton Avenue West, to provide water service connection to trailers at the Main Entrance site. Lire la suite »

mars 142017

Shoring at Fairbank Station Service Building

What Work is Taking Place?

Beginning in mid-March 2017, crews will start support of excavation work, also known as shoring, at the future Fairbank Station Service Building.  The Service Building is located on the southwest corner of Eglinton Avenue West and Dufferin Street, and will be used to host mechanical and electrical equipment for the station.   Lire la suite »

mars 032017

Subsurface Utility Engineering Investigation at Fairbank Station

What Work is Taking Place?

Beginning in March 2017, crews will begin subsurface utility engineering at the future Fairbank Station, in which boreholes will be drilled into the roadway in order to investigate underground utilities and ground conditions in advance of wet utilities relocation.  This work will take place throughout the vicinity of Eglinton Avenue West and Dufferin Street.  Lire la suite »

février 082017

Gas Line Distribution Work at Fairbank Station

What Work is Taking Place?

  • To accommodate the new Eglinton Crosstown, Enbridge is required to relocate a gas line in the area of Dufferin Street and Eglinton Avenue West.
  • Work will start in February and last for approximately two weeks

Enbridge Work Lire la suite »