Geotechnical Monitoring Work at Bayview and Eglinton
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
Geotechnical Monitoring Work at Bayview Avenue and Eglinton Avenue East
What Work is Taking Place?
On Wednesday, June 24, 2020 geotechnical investigation work will continue at Bayview Avenue and Eglinton Avenue East. Using a saw cutter and hydro-vacuum truck, crews will remove the sidewalk concrete and expose utilities, to access the monitoring points underground.
To facilitate this work, crews will be required to temporarily occupy the eastbound lane on Eglinton Avenue East, between Mann and Bayview Avenues, from 7:00 a.m. – 5:00 p.m. for approximately four (4) days. During this time, Eglinton Avenue East will be reduced to one lane only between Mann and Bayview Avenues, alternating traffic in each direction. Pedestrians will be rerouted around the work zone. Barriers will be used to delineate pedestrians from traffic and construction. Traffic control personnel and/or a paid duty officer will be present, while this work takes place. Crews will reopen the lane after each day of work and will endeavor to minimize disruption as much as possible.
Hours of Work
- Wednesday June 24 – Saturday June 27, 2020
- Work is expected to take place from 7:00 a.m. – 5:00 p.m.
- Work may be rescheduled or delayed due to inclement weather or unforeseen circumstances.
Work Area Map
What to Expect
- Noise from construction activity, including drilling, trucks, utility work, and use of heavy equipment.
- Construction vehicles and trucks will stage within work zones and traffic tapers
- Expect delays while travelling through the intersection.
Traffic Details
- The eastbound lane on Eglinton Avenue East, between Mann and Bayview Avenues, will be temporarily occupied, while this work takes place.
- Eglinton Avenue East will be reduced to one lane only between Mann and Bayview Avenues, alternating traffic in each direction, while this work takes place.
- Traffic control personnel and/or a paid duty officer will be present, while this work takes place.
Pedestrian Details
- Pedestrians will be rerouted around the work zone.
- Barriers will be used to delineate pedestrians from traffic and construction.
Transit Information
·
Access to TTC will be maintained at all times.
·