septembre 182017

Site Service Connections at Oakwood Station

What work is taking Place?

Crews will complete temporary water and sanitary connections at the Main and Secondary Entrance. Lire la suite »

août 292017

Pedestrian Safety near Construction Sites

The tunnelled section between Brentcliffe Road and Black Creek Drive is complete, and last year, construction activities began at all 15 underground stations including Kennedy Station. The preparatory works at the at-grade portion of the line, between Brentcliffe Road and Kennedy Station, also started this summer. Since the end of school, many work zones have been set up for construction and some major intersections along Eglinton Avenue have changed.

Lire la suite »

août 092017

Fairbank-Oakwood Construction Liaison Committee Meeting

The construction liaison committee meeting of Fairbank and Oakwood stations was held on August 8, 2017. You can see the presentation here:

Lire la suite »

juillet 202017

Crane Delivery and Installation at Oakwood Station

What Work is Taking Place?

 

A large overhead crane will be delivered and installed at the Oakwood Main Entrance starting the week of July 24th.   Lire la suite »

juillet 122017

Upcoming: Shoring and Excavation at Oakwood Station

 

Since 2016, shoring and excavation work has been underway at the main and secondary entrance sites for the future Oakwood Station. Excavation at the Main entrance is currently underway and will be followed by mining operations in late 2017.  Lire la suite »

mai 172017
avril 132017

Construction Material Storage for Oakwood Station

Construction Material Storage for Oakwood Station 

 

What work is taking place?

  Lire la suite »

avril 072017

Fairbank and Oakwood Stations Open House

Thank you for attending our Fairbank and Oakwood Stations Open House on April 6, 2017.

For those of you who missed it, the presentation is here:

Lire la suite »

mars 312017

LOW WATER PRESSURE NOTICE: Watermain Investigation Work

What Work is Taking Place?

On April 3, 2017, crews will begin subsurface utility engineering (SUE) investigation of a large 900mm watermain in the Eglinton Avenue West and Chaplin Crescent area.  The watermain will be exposed to determine the utility and ground conditions in advance of wet utilities relocation.  Most of the work will take place within the existing traffic staging at Chaplin Crescent and Eglinton Avenue West. Lire la suite »