Road Widening and Restoration on Eglinton Ave, West of Bermondsey Road
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
What Work is Taking Place?
Crews will be performing road widening activities on the south side of Eglinton Ave E, west of Bermondsey Road as early as August 18, 2020. To accommodate these activities, a work zone will be set up on in front of the west Esso Driveway on Eglinton Avenue East. Roadworks and driveway construction will continue for approximately one week. The sidewalk on the south side of Eglinton Ave E will be closed at the work zone. All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East.
What to Expect
Road widening and reconstruction activities include wet utility installations, saw cutting, concrete removals, excavation, backfill, compaction, curb and sidewalk reconstruction, asphalting and final paving. Crews will also be constructing the driveway and tying it in to the newly widened road.
TRAFFIC IMPACTS
• Closure of one eastbound lane in front of the work zone on Eglinton Ave E.
• Closure of the west Esso driveway on Eglinton Ave E.
PEDESTRIAN IMPACTS
• The pedestrian walkway will be available on the north side of Eglinton Ave E.
• There will be a sidewalk closure on the south side of Eglinton Ave E in front of the Esso.
• Signage will be installed in advance of the closure; north south crossing is available at the Credit Union/Swift and Bermondsey/Sloane intersections.
TTC IMPACTS
• All TTC bus stops will remain in their current locations.
HOURS OF WORK
• Work will begin as early as August 18, 2020 and continue for approximately one week.
• Work may occur from 7:00 a.m. to 11:00 p.m., seven (7) days per week, Monday through Sunday.
• Work may be rescheduled due to unforeseen circumstances.
OTHER IMPACTS
• Due to the nature of this work, at times there will be noise and vibration around the work area.