Eglinton Crosstown LRT Environmental Project Report
Report
Chapter 1
Chapter 2
Chapter 3
Project Description
- Sections 3.1 to 3.4
- Sections 3.5.1 to 3.5.6
- Sections 3.5.7 to 3.5.8
- Section 3.6
- Plates Part 1 (Index, Plates 1 to 45)
- Plates Part 2 (Plates 46 to 89)
Chapter 4
Existing and Future Conditions
Chapter 5
Chapter 6
Chapter 7
Appendix
- Cover, Table of Contents for Appendices A-H
- Cover, Table of Contents for Appendicies I - J
- Cover, Table of Contents for Appendices K-N
Appendix A
Appendix B
Archaeological Assessment Report
Stage 1 Report
Stage 2 Report
Appendix C
Appendix D
Drainage and Stormwater Management Assessment Report
Appendix A
Appendix B
Appendix C
Appendix E
Geotechnical Assessment Report
Martin Grove Road to Kennedy Station
- Text
- Borehole Location Plan Drawings (Index, Dwgs. 1 to12)
- Borehole Location Plan Drawings (Dwgs. 13 to 24)
- Borehole Location Plan Drawings (Dwgs. 25 to 36)
- Borehole Location Plan Drawings (Dwgs. 37 to 51)
- Borehole Location Plan Drawings (Dwgs. 52 to 66)
- Borehole Location Plan Drawings (Dwgs. 67 to 81)
- Borehole Location Plan Drawings (Dwgs. 82 to 95)
- Borehole Logs – Part 1
- Borehole Logs – Part 2
- Borehole Logs – Part 3
- Borehole Logs – Part 4
- Borehole Logs – Part 5
- Borehole Logs – Part 6
Airport Section
- Text
- Drawings (Overview)
- Drawings (Alignments 1 and 2)
- Drawings (Alignments 3 and 4)
- Borehole Logs – Part 1
- Borehole Logs – Part 2
Appendix F
Hydrogeological Assessment Report
Appendix G
Natural Heritage Assessment Report
Appendix H
Appendix I
Property Waste and Contamination Assessment Report
Appendix J
Consolidated Traffic Report
- Section 1 (Text, Appendices I to IV)
- Section 1 (Appendices V to VIII)
- Section 2 (Intro, Martin Grove to Jane)
- Section 2 (Victoria Park to Birchmount, Summary and Conclusions)
- Section 3 and Section 4
Appendix K
Jane Street to Keele Street – Vertical Alignment Options
Appendix L
DMLRT-ECLRT Special Study Area Detailed Assessment
Appendix M
Consultation
- Introduction
- Preliminary Planning Phase
- Open House #1
- Open House #2
- Open House #2A
- Correspondence
- Transit Project Assessment Phase
- Open House #3
- Correspondence
- Matrix of Public Comments Received and Reponses Provided
- Matrix of Comments Received from Government Review Team and Responses Provided