Launch Shaft Construction for Tunnelling

A massive launch shaft – 60 metres long, 20 metres wide and 16m below the ground will be excavated adjacent to Keelesdale Park between Black Creek Drive and Keele Street. The shaft will enable the tunnelling machines to be safely lowered and launched eastward in 2012. The tunnelling machines are so large that the parts will be lowered by crane and assembled on site.

Keelesdale Park – Launch Area and rendering of future Bridge and York Community Centre at Black Creek and Eglinton

Keelesdale Park – Launch Area and rendering of future Bridge and York Community Centre at Black Creek and Eglinton.

Launch Shaft Excavation Stage 1

Launch Shaft Excavation Stage One.

Launch Shaft Excavation Stage 2

Launch Shaft Excavation Stage Two.

Launch Shaft Excavation Stage 3

Launch Shaft Excavation Stage Three.

Launch Box and Tunnelling Machines lowered by crane

Launch Box and Tunnelling Machines lowered by crane.

Tunnel From above with beams removed to visualize scale

Tunnel From above with beams removed to visualize scale.

Launch Shaft and Tunnel - Tunnel boring machines are launched eastward

Launch Shaft and Tunnel - Tunnel boring machines are launched eastward.