What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Mount Dennis Mobility Hub Update and Station Design Review
We want to hear from you! Metrolinx invites you to attend a public information meeting to learn more about the Mount Dennis Crosstown station design concept, the built form and public realm concepts for five focus areas within the Mount Dennis Mobility Hub Study Area, based on previous community input.
The information meeting will be held starting at 6:30pm with an opportunity to view displays and speak one-on-one with staff. We look forward to seeing you there. Read more »
Mount Dennis Mobility Hub Update and Station Design Review
The Mount Dennis Mobility Hub Update and Station Design Review workshop is now closed. Thank you to everyone who attended the open house or submitted their comments online.
The purpose of the presentation was to present a preliminary station design concept and a series of more refined concepts for how the lands around the station could develop over time. You can view the full presentation below. Read more »
Designing the Future of Eglinton: Public Workshops
We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.
Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »
Central Station Reference Concept Design Online Consultation
The online consultation for the Central Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online.
Please review the public consultation report (PDF). Read more »
Designing the Future of Eglinton: Public Workshops
We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.
Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online Consultation
The online consultation for the Functional Design Presentation At-Grade Section: Don Mills to Ionview is now closed. Thank you to everyone who attended the open house or sent comments to us online.
Please review the public consultation report (PDF). Read more »
Designing the Future of Eglinton: Public Workshops
We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.
Metrolinx will be presenting preliminary designs for stations, including some information that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »
West Station Reference Concept Design Online Consultation
The online consultation for the West Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online.
Please review the public consultation report (PDF). Read more »
Designing the Future of Eglinton: Public Workshops
We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.
Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »
Environmental Assessment Update: East Tunnel Alignment
Rapid and reliable transit is coming to the centre of Toronto. The Crosstown will move Torontonians to work, school and play faster than ever before – reducing travel times and enhancing our economy and our environment. The Crosstown will run along Eglinton Avenue and transit travel will be up to 60% faster than today. Read more »