Bermondsey Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

Bell Utility Relocations Between Gervais Dr & Victoria Park Ave
What Work is Taking Place?
The Eglinton roadway is changing as work continues to prepare for the construction of the surface section of the Eglinton Crosstown LRT that will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be l Read more »
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park was held on March 1, 2018. You can see the presentation here:
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park was held on January 11, 2018. You can see the presentation here:
Hydro Utility Upgrades and Relocation on Eglinton Avenue between Sloane Avenue and Victoria Park Avenue
Original Issue Date: November 22, 2017
Re-Issued Date: January 22, 2018
What Work is Taking Place? Read more »
Science Centre Station and West At-Grade (Sunnybrook Park Stop to O'Connor Stop) Open House
Thank you for attending the open house about Science Centre Station and West At-Grade (Sunnybrook Park Stop to O'Connor Stop) on November 14, 2017. Read more »
Installation of Temporary Traffic Signals Across Eglinton Avenue East Between Leslie Street and Kennedy Road
Updated: November 6, 2017
Original Post: October 20, 2017
What Work is Taking Place?
Crews will remove existing traffic signals and install temporary traffic signals on Eglinton Avenue East between Leslie Street and Kennedy Road, to make way for the construction of future surface stops for the Eglinton Crosstown LRT.
Timing Read more »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park was held on November 2, 2017. You can see the presentation here:
Installation of Temporary Traffic Signals Across Eglinton Avenue East Between Leslie Street and Kennedy Road
What Work is Taking Place?
Crews will remove existing traffic signals and install temporary traffic signals on Eglinton Avenue East between Leslie Street and Kennedy Road, to make way for the construction of future surface stops for the Eglinton Crosstown LRT.
Timing Read more »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park was held on October 5, 2017. You can see the presentation here: