What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Utility Work at Bayview and Eglinton (Update)
The Eglinton Crosstown is a 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue through the heart of Toronto, with an underground central section. The line will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today.
What work is starting?
What: Crews will be doing some preparatory work at the intersection of Bayview Avenue and Eglinton Avenue East prior to the utility relocation and headwall construction for the future Bayview Station. Read more »
Temporary Water Shut Off - Wednesday May 20th 2015
What: A temporary Water Shut Off is scheduled for the above noted date. During this time, the water main will be shut off and there will be no water available from the taps.
When: 10:00 am to 5:00 pm on, Wednesday May 20th, 2015
Where: Temporary water shut off will be experienced by north side properties of:
1220 to 1164 Eglinton Ave West Read more »
Gas line relocation for future Oakwood Station - Starting the week of June 1st, 2015
What work is starting?
What: Enbridge Gas Distribution (Enbridge) will be relocating natural gas pipelines at the site of the future Oakwood Station. Blue highlights indicate where work crews will occupy one lane of the road.
Temporary Water Shut Off - Saturday, May 9, 2015
What: There will be a temporary water shut off on Saturday, May 9th. Between 6:00am and 9:00am, there will be no water available from the taps.
When: Saturday, May 9, 2015, 6:00 A.M. to 9:00 A.M.
Where: Temporary water shut off will be experienced at the following addresses:
- 20, 30, 40, 50 Eglinton Avenue East (north side)
Why: Construction on the water main is part of the continued construction of the extraction shaft. Read more »
Mount Pleasant Public School Meeting May 5
On Monday, May 4, Councillor Josh Matlow hosted a public meeting with the TDSB, parents of children attending Eglinton Junior Public School and Metrolinx to discuss station construction plans regarding the location of a vent shaft on school property, and general construction staging activities regarding the setup of a jet grout plant nearby. Read more »
Parking in the vicinity of Mount Pleasant, Bayview and Laird during construction
Transforming transit across the middle of Toronto is a significant undertaking and requires a lot of coordination. Construction is visible along the Eglinton corridor and on many side streets while we work to build this important transit project. In some cases, there will be short-term local street closures, turning and parking restrictions to allow for the construction to take place Read more »
Stage 2 Cross Passage Construction near Locksley Ave. and Alameda Ave.
What:
A cross passage is a tunnel cut between two other parallel tunnels required for maintenance or emergency purposes.
Stage 2: Cross Passage Construction near Locksley Ave. and Alameda Ave. Stage 2 work involves the placing of a generator and a dewatering treatment tank occupying a short curb lane restriction for approximately 6 months.
Where: Read more »
What kind of work is upcoming in the vicinity of Bayview Avenue?
Utility Relocation: The first stage of work in this area is utility relocation. Construction of headwalls requires some utilities such as hydro, gas, water, telecommunication, etc. to be moved safely out of the way in advance of tunnel and station construction. Read more »
Cross Passage Headwall Construction near Duncannon Drive Continues - Stage 2
What we are building
What: A cross passage is a tunnel cut between two other parallel tunnels required for maintenance or emergency purposes. Crews will be building one headwall for the future cross-passage required for future maintenance of the tunnels. Read more »
Lane Reduction near 666 Eglinton Avenue East – Saturday, April 25
What/Where: Crews will be installing a hydro pole on City of Toronto property near 666 Eglinton Avenue east.
Why: The next stages of Emergency Exit Building construction near Leaside High School requires some hydro utility relocation. Specifically, a hydro pole needs to be installed and overhead hydro wires relocated.
When: Read more »