Concrete Pours at Fairbank Station - October 23, 2020

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
October 22, 2020

 

What Work is Taking Place?

Crews at Fairbank continue to perform large concrete pours. On Friday October 23, crews will be pouring the concourse wall within the station box. Work will begin as early as 7:00am and the pours will be ongoing for approximately eight hours. Concrete pumps will be placed in the laneway parallel to Eglinton Ave W, south of the intersection. Concrete trucks will be staged on Dynevor Rd. The laneway parallel to Eglinton Ave W between Dynevor Rd and Dufferin St will be closed for the duration of the pour. Dufferin St and Eglinton Ave W will remain open while this work takes place.

 

What to Expect

Concrete trucks will be staged on Dynevor Rd, south of Eglinton Ave W. Access to properties along Eglinton Ave W, Dufferin St, and Dynevor Rd will be maintained. Noise from concrete trucks can be expected.

 

HOURS OF WORK

  • Friday October 23
  • The concrete pours will begin as early as 7:00am and last for approximately eight hours
  • The contractor may not always work during the permitted hours but may do so at its discretion
  • Work may be rescheduled due to weather or unforeseen circumstances. Should any unforeseen circumstances arise, the pour will take place on Saturday October 24
  • This work may be longer or shorter than expected

 

TRAFFIC IMPACTS

  • The laneway between Dufferin St and Dynevor Rd will be closed to all vehicular traffic for the duration of the pour
  • Concrete trucks will be staged on Dynevor Rd
  • Dufferin St and Eglinton Ave W will remain open

 

PEDESTRIAN IMPACTS

  • Periodic sidewalk interruptions – pedestrians will be rerouted to temporary sidewalk
  • All TTC bus stops will remain in their current locations