Construction Notice: Temporary Lane Reduction at Chaplin Station (Dec 27-31, 2019)

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
December 19, 2019

What Work is Taking Place?

Temporary lane reductions will be in effect in Chaplin Crescent and Eglinton Avenue West on Friday December 27 to Tuesday December 31, 2019, while crews drill boreholes and install geotechnical monitoring equipment at the southwest area of the intersection. Eglinton Avenue West and Chaplin Crescent will both be reduced to one lane only, alternating traffic in each direction. Paid Duty Officers will be present. At the end of each shift, the area will be plated and one lane of traffic on each direction will be restored.

Hours of Work

  • Beginning Friday December 27, 2019 for approximately five (5) days.
  • 7 a.m. to 6 p.m.

 Construction Staging

Traffic configuration for temporary lane reduction at Chaplin station from Dec 27 to 31 2019

What to Expect

  • Noise from construction activity can be expected

Traffic Details

  • Traffic on both Chaplin Crescent and Eglinton Avenue West will be reduced to one lane only, alternating traffic in each direction
  • Traffic control personnel and Paid Duty Officers will be present to provide traffic control
  • Motorists can expect delays when travelling through the intersection

Pedestrian Details

  • Pedestrian routing will remain the same

Travelling Smart during Construction 

Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.

Stay Informed

Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

 

Disponible en français

Thank you for your continued patience as we work to build this important project.

Please support your local businesses during construction.