April 032019

Track Slab Concrete Pour of Guideway- Eglinton Square - April 5 & April 6, 2019

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will conducting a concrete pour of the guideway in the center of Eglinton Avenue East between Eglinton Square and Pharmacy Avenue. Read more »

April 032019

Tower Crane Installation at Cedarvale Station

What Work is Taking Place?

To accommodate excavation activities and upcoming station construction for the new Cedarvale LRT Station, crews will be installing a tower crane adjacent the Eglinton West Subway Station. The crane is approximately 15 metres tall, has a jib that extends to 40 m, and a maximum capacity of approximately 20 metric tonnes.

Hours of Work Read more »

April 032019

Upcoming Traffic Changes at Eglinton Station

What Work is Taking Place?

As decking nears completion at Eglinton Avenue and Holly Street, crews will be moving the work zone to the north side of Eglinton Avenue between Holly Street and Dunfield Avenue. The next phase (depicted below) will take approximately 2-3 months to complete. 

 

Hours of Work Read more »

April 032019

Track Slab Concrete Pour of Guideway at Eglinton Square - April 3, 3019

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will conducting a concrete pour of the guideway in the centre of Eglinton Avenue East between Eglinton Square and Pharmacy Avenue. Read more »

April 022019

Water Shut-off for Watermain Reinstatement Work at Taunton Road April 4, 2019

What Work is Taking Place?

On Thursday April 4, 2019, there will be a water shut-off starting at 9:00 a.m. for approximately seven (7) hours while crews perform watermain connection work at Eglinton Avenue East and Taunton Road.  This activity is required to complete the ongoing watermain reinstatement work.  Due to the equipment required to perform this activity, such as a hydro-vacuum truck, this shut-off will be conducted during the day.  Affected properties are listed below. Read more »

April 022019

Temporary Crosswalk Removal at Fairbank Station April 3 – 9, 2019

What Work is Taking Place?

The east crosswalk at Dufferin Street and Eglinton Avenue West will be temporarily unavailable for approximately one week while crews perform drilling work on the southeast corner.  During this time, the west crosswalk will remain open.  Upon completion of the work, the east crosswalk will be restored.

 

Details

  • April 3, 2019 for approximately one (1) week

 

Construction Staging Read more »

April 022019

Daytime Concrete Pour at Fairbank Station - April 3, 2019

What Work is Taking Place?

On Wednesday April 3, crews will perform a concrete pour at the Main Entrance area of Fairbank Station. The concrete will form part of the Main Entrance walls.  A concrete pump will be placed on Vaughan Road behind the Main Entrance site, and concrete trucks will deliver concrete to the site.  Dufferin Street and Eglinton Avenue West will remain open while work takes place.

Hours of Work Read more »

April 012019

Extended: Sidewalk Closure for Civil Road Work between Pharmacy Avenue and Lebovic Avenue

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting civil road work in relation to road widening works on the south side of Eglinton Avenue East between Pharmacy Avenue and Lebovic Avenue.  Work began in February 2019 and will be extended until the end of April 2019.

There will be sidewalk closure on the south side of Eglinton Avenue East between Pharmacy Avenue and Lebovic Avenue in order to safely carry out the work.

Hours of Work Read more »