Construction Updates

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

Syndicate content
 
September 212016

Monitoring Instrument Installation for Leaside (Bayview) Station

What Work is Taking Place?

  • As part of the preparatory works for the future Leaside Station construction, installation of above ground and in-ground monitoring points will take place in the vicinity of Eglinton Avenue East and Bayview Avenue. These monitors will provide information on ground conditions during station construction.

Timing Read more »

September 202016

Enbridge Gas Distribution Line Relocation near Kennedy Station

What Work is Taking Place? 

  • To accommodate the construction of the Eglinton Crosstown LRT, Enbridge Gas Distribution (Enbridge) is required to relocate a gas line on Eglinton Avenue East between Ionview Road and Kennedy Road. These pipelines are integral to Enbridge’s gas system and must be re-routed to ensure the safe and reliable delivery of natural gas to customers in the Greater Toronto Area.

Timing Read more »

September 132016
September 062016

Pedestrian Safety near Construction Sites

Construction of the Eglinton Crosstown LRT line, including 15 underground stations, is underway. Since the end of school, many construction sites have been set up for station construction and the set-up of some major intersections along Eglinton Avenue has been changed.

Pedestrian Information Read more »