Enbridge Gas Distribution Line Relocation Victoria Park Avenue & Eglinton Avenue East

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
June 19, 2017

What Work is Taking Place? 

Enbridge Gas Distribution (Enbridge) is relocating a gas main in the Eglinton Crosstown LRT corridor on Eglinton Avenue East between Victoria Park Avenue and Saddle Ridge Drive. 

Timing

  • Work will start at the end of June 2017 and will last for approximately four weeks.
  • Work will occur between 7:00 a.m. and 5:30 p.m., Monday to Friday.
  • Work could be rescheduled due to weather conditions or any unforeseen circumstances.

What to Expect

  • Every effort will be made to minimize disruption.
  • Residents and businesses near the work site can expect to hear noise caused by trucks, excavators, backhoes, and other construction equipment related to this work.

Traffic and Pedestrian Details

  • During construction hours, lane reductions or short-term road closures may be required on Eglinton Ave. E. and Victoria Park Ave. These roads will be reopened in the evening for local residents.
  • Please take care when travelling near construction areas. Watch for additional signs directing pedestrians as detours may be required.
  • Due to the current volume of traffic in this area, traffic delays are expected during construction.
  • Property access will be maintained.
  • Sidewalk access in the area could be affected. Please watch for signage directing pedestrian traffic.

 

For more information about the gas line relocation, please contact Enbridge at (416) 495-4809 or enbridgegasmedia@enbridge.com

 

Thank you for your patience as we work to build this important project.

Please support your local businesses during construction.

Sign up at www.thecrosstown.ca/sign-up to receive regular email updates