October 10 2019

Upcoming Traffic Configuration Change at Yonge and Eglinton Intersection to Support Tunnel Ventilation Shaft Construction

 

In mid-October 2019, a new traffic configuration will be implemented at Yonge Street and Eglinton Avenue to facilitate construction of a tunnel ventilation shaft for TTC’s Line 1 subway.  

In order to facilitate the work, a new work zone will be erected in the middle of the Yonge Street between Eglinton Avenue East and Roehampton Avenue, with vehicle traffic travelling on either side of the work zone.   Read more »

October 10 2019

Decking Repair and Dewatering Works Leaside Station

From Tuesday October 15 to Friday October 18, Leaside team will continue decking repairs in the Eglinton and Bayview intersection. Dewatering work will also take place on the Howard Park Pathway. The traffic and pedestrian configuration below will be in place for the duration of the works.

HOURS OF WORK Read more »

October 10 2019

Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue

Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue

WHAT WORK IS TAKING PLACE? Read more »

October 09 2019

Road Widening on Eglinton Avenue east at Saddle Ridge Drive and Cranborne Avenue

Road Widening on Eglinton Avenue east at

Saddle Ridge Drive and Cranborne Avenue Read more »

October 09 2019

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT

 

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT

WHAT WORK IS TAKING PLACE? Read more »

October 08 2019

Guideway Excavation from Birchmount Road to Rosemount Drive

 

What Work is Taking Place?

As part of the ongoing pavement reconstruction works along Eglinton Avenue East in support of construction of the future surface stops, crews will continue with guideway excavation from Birchmount Road to Rosemount Drive.

As early as October 9th, 2019 the construction zone will shift to the center of Eglinton Avenue East between Birchmount Road to Rosemount Drive and be in place for approximately four (4) weeks.  Read more »

October 07 2019

Update: Excavation at Chaplin Station

Excavation continues at the Chaplin Station.  Crews are excavating at the Main Entrance, located on the north side of Eglinton Avenue between Chaplin Crescent and Gilgorm Road, and at the Tertiary Entrance, located on the south side of Eglinton Avenue, east of Chaplin Crescent.Read more »

Categories:
October 04 2019

Extended Construction Hours at Mount Pleasant Station Beginning October 2019

 

Starting Tuesday October 15, crews will begin working extended hours at Mount Pleasant Station to accelerate construction.  Extended hours work will be completed in phases, beginning with shallow excavation and roof construction from October 2019 through February 2020.  On-site mitigation measures will be in place to minimize disruption caused by this work.  Read more »

October 04 2019

North Staircase Relocation at Wynford Drive Bridge

WHAT WORK IS TAKING PLACE?

Guideway construction and bridge rehabilitation continue on Eglinton Avenue East at Wynford Drive. On October 9 and 10, 2019, crews will be shifting the north staircase back to its original location at the bridge. The relocation will require a temporary change to traffic alignment on Wynford Drive (depicted below) to accommodate the crane setup area.  

 

TIMING  Read more »