What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
January 13 2017

Bell Utility Relocations at Leaside Station

What Work is Taking Place?

To complete the Bell Relocation works currently underway on the southwest corner of Bayview Avenue and Eglinton Avenue East, crews will extend the work zone into the intersection on the south side of Eglinton Ave East.

Stage 2 for Bell Utility Relocations

Timing Read more »

January 06 2017

Utilities Relocation Continues at Chaplin Station

What Work is Taking Place?

Since August 2016, crews have been relocating of existing telecommunication (Bell) and hydro lines in the vicinity of Chaplin Crescent and Eglinton Avenue West, in preparation for the next phase of station construction, shoring. Read more »

December 28 2016

Temporary Street Lights for Kennedy Station

What Work is Taking Place?

  •  Crews will begin installing temporary overhead street light wire on the south side of Eglinton Avenue East between Ionview Road and Kennedy Road.
  • Underground street light wiring will be replaced with overhead wiring.

Timing Read more »

December 23 2016

Short Term Lane Closures along Eglinton Avenue for Monitoring Equipment Installation for Oakwood Station

What Work is Taking Place?

Crews will be installing ground movement monitoring equipment at Oakwood station. These monitors will provide information on ground conditions during station construction. Read more »

December 22 2016

Upcoming Works at Eglinton Station: Utilities Relocations

What work is Taking Place? 

Work will commence to replace and relocate existing utilities in the area of Yonge Street and Eglinton Avenue to make way for the future Eglinton interchange station. Over the coming months, storm and sanitary sewers, water mains, hydro ducts, and telecommunications utilities will be replaced and relocated in a series of stages.

Timing Read more »

December 22 2016

Overnight Work for Science Centre Station

What Work is Taking Place?

A large drill rig will be moved from the secondary entrance on the northeast corner to the south side of Eglinton Avenue East at Ferrand Drive. The drill rig is required in preparation for piling work in support of the future Science Centre Station.

Timing Read more »