December 09 2016

UPDATE: Shoring Work and Temporary Laydown Area Oakwood Station

UPDATE: Shoring Work and Temporary Laydown Area

OAKWOOD STATION

  Read more »

December 09 2016

Update: Maintenance Work at Cross Passage 11

What work is Taking Place? 

Crews will perform maintenance on the dewatering wells for Cross Passage 11.  Dewatering wells are required for cross passage construction to ensure that the water table remains low enough to allow for hand mining work to be completed.

Hours of Work Read more »

December 01 2016

Overnight Subsurface Utility Engineering Investigation at Kennedy Station

What Work is Taking Place?

  • Utility investigation work onsite within TTC land at Kennedy Station along the Eglinton Service Road continues to determine the location and depth of existing utilities. 

Upcoming Utility Investigation

  • Crews will  hydro-vacuum test pits over top of existing utilities within the TTC boulevard west of the SRT tracks.    

Timing Read more »

November 30 2016

UPDATE: Access to Ferrand Drive from Eglinton Avenue Closed Dec. 5 & 6

What Work is Taking Place?

Crews will be grading and paving on Eglinton Ave East along Ferrand Drive to prepare for the future construction of Science Centre Station. To complete the work, access to Ferrand Drive from Eglinton Avenue East will be closed.

Timing Read more »

November 29 2016

Shoring and Guide Wall Construction at Fairbank Station Main Entrance

What Work is Taking Place? 

Beginning in late November 2016, crews will start support of excavation work, also known as shoring, at the future Fairbank Station.  The main entrance is located on the southeast corn Read more »

November 28 2016

One Day Road Closure: Roehampton Avenue

What Work is Taking Place?

A large crane is required to replace hydro poles on the east end of Roehampton Avenue. Safe crane operation near hydro lines necessitates the road closure.

Timing Read more »

November 28 2016

Subsurface Utility Engineering (SUE) Investigation at Kennedy Station - Updates

What Work is Taking Place?

  • Crews will continue with preparatory work for Kennedy Station by conducting Subsurface Utility Engineering (SUE) Investigation within the GO Corridor to locate existing underground utilities within the boundaries of the east corridor and future west corridor.

Timing Read more »