What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Median Removals and Temporary Traffic Light Installation at Leaside Station
What Work is Taking Place?
To prepare for future construction of the Leaside Station, crews will remove existing medians on Bayview Avenue, north and south of Eglinton Avenue. Crews will also be installing temporary traffic lights around the intersection at Eglinton Avenue East and Bayview Avenue.
Timing Read more »
Subsurface Utility Engineering (SUE) Investigations at Bayview and Eglinton
What Work is Taking Place?
- To prepare for future construction of the Leaside Station, crews will be conducting Subsurface Utility Engineering investigations along Eglinton Avenue East to determine the location and depth of existing utilities.
- Crews will drill and use a vacuum truck overtop of existing utilities within the boulevard and roadway, then a surveyor will examine the utilities to obtain coordinates for design purposes.
Timing Read more »
Removal of Traffic Signals and Installation of Temporary Traffic Lights and CCTV for Science Centre Station
What work is Taking Place? Read more »
Science Centre Station Open House
Thank you for attending our Science Centre station open house on July 11, 2016.
For those of you who missed it, the presentation is here:
Update: Emergency Exit Building Construction near Petman Avenue Work Shifts to Middle Lanes of Eglinton Avenue East for Utility Relocation and Road Decking
What work is Taking Place?
What: With utility relocation work and road deck installation on the north side of Eglinton complete, crews will switch to the middle lanes of Eglinton. During this stage, crews will continue to relocate utilities and install road decking. Following work in the middle Eglinton lanes, construction will return to the south side of Eglinton. Read more »
Cross Passage Construction: Eglinton Avenue East at Walder Avenue
What
A cross passage is a small passageway built to connect the eastbound and westbound tunnels for maintenance and emergency purposes. Dewatering equipment is used at street level on Eglinton Avenue above the cross passage location. Dewatering is the process of removing groundwater from around the tunnel level below. The dewatering equipment will be in place for the duration of the building of the cross passage. Read more »
Park Hill Road Closure at Cedarvale Station
The closure of Park Hill Road was first communicated in a notice on April 19th 2016. This work had been delayed due to unforeseen circumstances. The closure of Park Hill Road will now proceed this month. The north-south pedestrian walkway along the Allen Road southbound will close at a future date. We apologize for any inconvenience. Read more »
Lane restrictions on Eglinton Avenue West near Duplex for Tunnel Survey Work
What Work is Taking Place? Read more »
Demolition at the Future Fairbank (formerly Dufferin) Station