What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
September 27 2016
September 21 2016

Monitoring Instrument Installation for Leaside (Bayview) Station

What Work is Taking Place?

  • As part of the preparatory works for the future Leaside Station construction, installation of above ground and in-ground monitoring points will take place in the vicinity of Eglinton Avenue East and Bayview Avenue. These monitors will provide information on ground conditions during station construction.

Timing Read more »

September 20 2016

Enbridge Gas Distribution Line Relocation near Kennedy Station

What Work is Taking Place? 

  • To accommodate the construction of the Eglinton Crosstown LRT, Enbridge Gas Distribution (Enbridge) is required to relocate a gas line on Eglinton Avenue East between Ionview Road and Kennedy Road. These pipelines are integral to Enbridge’s gas system and must be re-routed to ensure the safe and reliable delivery of natural gas to customers in the Greater Toronto Area.

Timing Read more »