What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Subsurface Utility Engineering (SUE) Investigation along Eglinton Avenue East
What work is taking place?
- As preparatory work for the future at-grade stops continues, crews will be conducting SUE investigations along Eglinton Avenue East to determine the location and depth of existing utilities.
- Working westward from Ionview Road to Victoria Park Road, crews will drill and use a vacuum truck overtop of existing utilities within the boulevard and roadway, then a surveyor will examine the utilities to obtain coordinates for design purposes.
When Read more »
Continued Geotechnical Testing on Cowbell Lane for Future Eglinton Station
Upcoming Works – Geotechnical Testing Read more »
Updated Notice: Temporary Sewer Restoration Work - Walder Avenue
What work is starting?
What: In conjunction with the nearby Eglinton Avenue East sewer rehabilitation work which occurred this past winter, crews are restoring a man-hole on Walder Avenue, just to the north of Eglinton Avenue.
Why: This work is necessary to complete the restoration work for Walder Avenue, following a major sewer upgrade beneath Eglinton Avenue. Read more »
Ontario Breaks Ground on First Eglinton Crosstown LRT Station
New LRT Will Create Jobs, Drive Economic Growth and Improve Quality of Life
Construction has begun on Keelesdale Station, the first of 25 stations to be built for the Eglinton Crosstown Light Rail Transit (LRT). The Eglinton Crosstown LRT is the largest public transit project currently under construction in Canada and represents the single biggest expansion of urban rapid transit in the Greater Toronto and Hamilton Area in more than half a century. Read more »
Update: Vacuum Truck at Emergency Exit Building #3 (Overnight Work)
What work is happening?
Construction at the Emergency Exit Building (EEB) site at next to Leaside High School continues. The contractor is in the process of using a vacuum truck for the purpose of lowering the water level in the emergency exit building shaft, so that they can safely open the tunnel boring machine cutterhead to perform needed maintenance.
Timing: Read more »
Sewer Investigation at the Future Science Centre Station (Overnight Work)
What work is starting? Read more »
Geophysical studies for future Oakwood Station
Information as of March 7, 2016 Read more »
Geophysical Studies for Future Avenue Station
Information as of March 7, 2016 Read more »