What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Continuation of Quality Testing of Headwall at Oakwood
The Eglinton Crosstown is a transit project that will provide rapid and reliable service across Eglinton Avenue including an underground central section and will be up to 60% faster than bus service today.
What: Crews will perform some core holes for quality testing at the Oakwood headwall locations.
Where: The work zone will be on the north east side of Eglinton Avenue West and Oakwood Avenue.
When: Starting as early as July 21, 2014 for two to three weeks, crews will perform some holes for quality testing. Read more »
Watermain Work at Bayview and Eglinton Avenues Starting the Week of July 21, 2014
What: Crews will be working on watermain construction on the east side of the intersection of Bayview Avenue and Eglinton Avenue East. Read more »
Allen Road Area – Sidewalk Detours
From Monday, July 21, 2014 onwards, pedestrian access to Eglinton West Station will be re-routed to facilitate the construction of the extraction shaft in the vicinity of the southbound Allen Road Ramp.
Pedestrian Details
Update: Cross Passage Headwall Construction near Vesta Drive - Stage 1
What we are building
What: A cross passage is a tunnel cut between two other parallel tunnels for maintenance or emergency purposes. Crews will be building one headwall for the future cross-passage required for future maintenance of the tunnels. Read more »
Work Zones to be shifted to the South Side of Eglinton at Chaplin
What is the purpose of the construction work at Chaplin?
Station headwalls create the frame for future underground stations, and are required to be in place prior to the arrival of tunnel boring machines at each of the station locations along the Eglinton Crosstown route. Construction of the headwalls requires a grout plant to be established nearby to pump a form of concrete, otherwise known as “grout”, to the station headwall location. Read more »
Continuation of Quality Testing of Headwall at Oakwood
The Eglinton Crosstown is a transit project that will provide rapid and reliable service across Eglinton Avenue including an underground central section and will be up to 60% faster than bus service today.
What: Crews will perform some core holes for quality testing at the Oakwood headwall locations.
Where: The work zone will be on the north west side of Eglinton Avenue West and Oakwood Avenue. Read more »
Launch Shaft Welding Overnight Work at Allen Road until end of Summer 2014
The Eglinton Crosstown is a transit project that will provide rapid and reliable service across Eglinton Avenue. It includes an underground central section from Keele Street to Laird Drive, bring transit service that will be up to 60% faster than bus service today.
What work is starting?
What: Crews will conduct overnight welding work at the launch shaft at Allen Road. During the day, crews will be building and installing a road deck for a future traffic shift for the continuing work of the launch shaft. Read more »
Laird Station East Headwall Construction for Twin Tunnels Stages One & Two – Reminder
The Eglinton Crosstown is a 19-kilometre light rail transit line that will run along Eglinton Avenue through the heart of Toronto, with an underground central section. The line will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today. Read more »
Rolling Lane Closures on Sutherland Drive at Eglinton Avenue East - Week of June 23, 2014
The Eglinton Crosstown is a 19 kilometre light rail transit (LRT) line that will run along Eglinton Avenue through the heart of Toronto, with an underground central section. The line will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today.
What work is starting?
What: Crews will be installing ground movement monitoring equipment. Read more »
Waste Collection Notice During Crosstown Construction
Your Waste Collection
The City of Toronto’s Solid Waste Management Services division is responsible for collecting, transporting, processing, composting and disposing of municipal and private sector solid waste and recyclables, as well as household hazardous waste. Read more »
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Construction Updates
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Wynford Drive
- Yonge Street