What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
September 13 2017

Utilities Relocation Continues for Chaplin Station

Utilities Relocation Continues for Chaplin Station 

What Work is Taking Place?

Since 2016, crews have been conducting utilities relocation work to make way for the construction of Chaplin Station.  Beginning in mid-September, crews will resume utilities relocation, including Bell duct bank work and relocation of a 300mm sanitary sewer. The work will be carried out within the existing work zones at the intersection of Chaplin Crescent and Eglinton Avenue West.

Hours of Work Read more »

September 08 2017

UPDATED: Dewatering System at Avenue Station

Updates: September 8, 2017
Latest Issue Date: May 15, 2017
Original Issue Date: April 17, 2017

 

What Work is Happening? Read more »

September 08 2017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on September 7, 2017. You can see the presentation here:

Read more »

September 07 2017

Overnight Watermain Relocation Work Week of September 10 for Science Centre Station

What Work is Taking Place? 

Crews will relocate an existing watermain on Eglinton Avenue East just east of Don Mills Road to support the upgrade of existing water infrastructure at the future Science Centre Station.

Timing Read more »

September 07 2017

Emergency Exit Shaft near Leaside Station: Tunnel Invert Concrete Pour

What Work is Taking Place?

To prepare for track system installation in the new LRT tunnels, concrete must be poured to form the foundation of the track. The emergency exit site in front of Leaside High School will be used as the access points to the tunnels.

Trucks will access the tunnel shaft from the construction site entrance near Bessborough Drive, pump concrete into a pipe, and drive the concrete down the tunnel to where it will be poured into place. Read more »

September 07 2017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on September 6, 2017. You can see the presentation here:

Read more »

September 01 2017

Update: Dewatering System at Laird Station

Re-Issue date: September 1, 2017

The term “dewatering” means pumping from the ground water at a site where there will be excavation.  At Eglinton Avenue East and Laird Drive, dozens of small wells will be drilled along the curbside eastbound lane. Wells will be drilled and shallow trenches will be required to lay the pipes, pumps, wells and valves to do the work.  

Hours of Work/ What to Expect  Read more »

August 31 2017

Additional Road Occupancy Beginning September 1 at Elevated Guideway & West LRT Portal

What Work is Taking Place?

As part of continued construction and traffic staging set up at Keelesdale Park Drive and Eglinton Avenue West for construction of the West LRT Portal and Elevated Guideway traffic restrictions in this area are changing. 

Crews will be working within the eastbound curb lane west of the Black Creek Drive and Eglinton Avenue West intersection, chipping concrete from the existing storm manhole and excavating two new sanitary manholes. Read more »

August 29 2017

Parking Lot Reductions and Associated Works at Kennedy Station

What Work is Taking Place?

Parking will be displaced in the East and South Parking Lots at Kennedy Station to facilitate construction of the Kennedy Station. Works include: Read more »

August 29 2017

Pedestrian Safety near Construction Sites

The tunnelled section between Brentcliffe Road and Black Creek Drive is complete, and last year, construction activities began at all 15 underground stations including Kennedy Station. The preparatory works at the at-grade portion of the line, between Brentcliffe Road and Kennedy Station, also started this summer. Since the end of school, many work zones have been set up for construction and some major intersections along Eglinton Avenue have changed.

Read more »