June 14 2017

Laird - Leaside Construction Liaison Committee Meeting

The construction liaison committee meeting of Leaside and Laird Stations was held on June 14, 2017. You can see the presentation here:

June 14 2017

Eglinton - Mount Pleasant Construction Liaison Committee Meeting

The construction liaison committee meeting of Eglinton and Mount Pleasant Stations was held on June 13, 2017. You can see the presentation here:

Read more »

June 13 2017

Forest Hill Station Open House

Thank you for attending our Forest Hill Station Open House on June 12, 2017.

For those of you who missed it, the presentation is here:

Read more »

June 13 2017

Enbridge Gas Distribution Line Relocation near Kennedy Station

What Work is Taking Place? 

To accommodate the construction of the Eglinton Crosstown LRT, Enbridge Gas Distribution (Enbridge) is required to relocate a gas line on Eglinton Avenue East (between Kennedy Road and Midland Avenue) and on Kennedy Road (between Treverton Drive and Eglinton Avenue East). 

These pipelines are integral to Enbridge’s gas system and must be re-routed to ensure the safe and reliable delivery of natural gas to customers in the Greater Toronto Area. Read more »

June 09 2017

Dewatering System Installation Eglinton Avenue East from Lillian Street to Redpath Avenue

What Work is Taking Place

The term “dewatering” means pumping from the ground water at a site where there will be excavation.  At Eglinton Avenue East between Lillian Street and Redpath Avenue, half a dozen small wells will be drilled for the future Cross Passage. The volume of soil that requires dewatering is significant.  The wells will be drilled and shallow trenches will be required to lay the pipes, pumps, wells and valves to do the work.   Read more »

June 09 2017

Preparatory Road Works on Eglinton Avenue East for Surface Stops

Preparatory Road Works on Eglinton Avenue East for Surface Stops

The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.

Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located.  Read more »

June 09 2017

UPDATE: Cedarvale Station Support of Excavation

Original issue date: March 14, 2017
Re-issue date: June 9, 2017

UPDATE: Cedarvale Station Support of Excavation

By the end of 2015, tunneling works in the vicinity of Allen Road had concluded. Throughout 2016 and the beginning of 2017, crews conducted preparatory works for the future Cedarvale Station construction. Read more »

June 08 2017

Caledonia Station, West Portal and Elevated Guideway Open House

Thank you for attending our Caledonia Station, West Portal and Elevated Guideway Open House on June 7, 2017.

For those of you who missed it, the presentation is here:

Read more »

June 07 2017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on June 6, 2017. You can see the presentation here: