What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
June 12 2020

Lane Reduction for Concrete Pour at Caledonia Station - June 13, 2020

What Work is Taking Place?

On Saturday June 13, crews at Caledonia will be pouring concrete to form walls in the future station’s Main Entrance. During the pour, westbound Eglinton Ave W will be reduced to one (1) lane only between Blackthorne Ave and Gabian Way. Lane reductions will begin as early as 10:00am and last for approximately six (6) hours. Read more »

June 12 2020

UTILITY CROSSING AT DON MILLS ROAD, EAST SIDEWALK

UTILITY CROSSING AT DON MILLS ROAD, EAST SIDEWALK

 

WHAT WORK IS TAKING PLACE? Read more »

June 12 2020

Crane Erection on Vaughan Road at Fairbank Station - June 15, 2020

What Work is Taking Place?

On Monday June 15, 2020, crews will install a crane on Vaughan Road adjacent to the Fairbank Station Main Entrance site. The crane will remain in place for approximately two weeks to assist with lifting and hoisting activities at the future station’s Main Entrance. Read more »

June 11 2020

Elevator Construction at Eglinton Station

 

What Work is Taking Place?

In June 2020, crews will begin construction of a new elevator inside of 2200 Yonge Street (former Smoke’s Poutinerie). The elevator will service the existing TTC Eglinton Station. Using a saw cutter, core drill and jack hammer, the existing concrete will be demolished. Demolition work will take approximately two weeks to complete. Once demolition work is complete, construction of the new elevator will begin.

 

Hours of Work Read more »

June 11 2020

Shelter Installation at Aga Khan Park & Museum Stop South Platform

Shelter Installation at Aga Khan Park & Museum Stop

What Work is Taking Place?  Read more »

June 11 2020

Road Widening and Reconstruction Eglinton Avenue East at Brentcliffe Road – South Side

ORIGINAL POST: MAY 8, 2020

UPDATED: JUNE 11, 2020

 

Road Widening and Reconstruction Read more »

June 10 2020

Lane Reduction for Concrete Pour at Caledonia Station - June 11, 2020

What Work is Taking Place?

On Thursday, June 11, crews at Caledonia will be pouring concrete to form a street level slab in the future station’s Main Entrance. During the pour, westbound Eglinton Ave W will be reduced to one (1) lane only between Blackthorne Ave and Gabian Way. Lane reductions will begin as early as 7:00am and last for approximately six (6) hours.

 

Hours of Work Read more »