Kennedy Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

Overnight OCS Cable Installation on Eglinton Ave at Laird, Leslie, Sloane & Kennedy. March 1 - April 2
What Work is Taking Place?
Crews will be installing OCS (Overhead Catenary System) cables along Eglinton avenue east between Laird drive, Leslie street, Swift drive, Sloane avenue, and Kennedy road. Overhead catenary is the system installed overtop of the rails of a light rail system, to provide operational power to the LRVs (Light Rail Vehicles). Read more »
UPDATED: Traffic Change at Kennedy Station, East of Kennedy Road - February 11,2021
|
Overnight Utility Inspection at Rosemount Dr and Eglinton Ave E
What Work is Taking Place?
Crews at Rosemount Drive and Eglinton Avenue East continue with utility activities. Overnight on Monday February 8, crews will be inspecting the existing utilities in the area, from as early as 11:30pm until 5:00am on Tuesday February 9. All current traffic restrictions at the intersection will remain in place.
Construction of new GO East Platform at Kennedy Station - November 9, 2020
What Work is Taking Place?
Beginning November 9, 2020, crews at Kennedy Station will begin construction on the new GO East platform. Excavation will take place for approximately two weeks followed by concrete works, backfill, electrical works and platform construction. Excavation will take place up to the fence line. The construction of platform will take approximately eight (8) months. Updates will be provided as work progresses
UPDATED: THESL Pole Relocation - Eglinton Avenue East between Ionview and Kennedy Road - October 6, 2020
Original Post: Aug 13, 2020
Updated on October 5, 2020
Crews will be relocating Toronto Hydro-Electric System (THESL) poles to their permanent positions along Eglinton Avenue East between Ionview Road and Kennedy Road. Work will be completed in sections and is expected to begin October 6 through to early November 2020. All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East.