Lane Reduction for Concrete Pour at Caledonia Station - August 7, 2020

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
August 6, 2020

What Work is Taking Place?

On Friday August 7, crews at Caledonia will be pouring concrete to form slabs and stairs within the station box. During the pour, westbound Eglinton Ave W will be reduced to one (1) lane only between Blackthorne Ave and Gabian Way. Lane reductions will begin as early as 6:00am and last for approximately 12 hours.

What to Expect

One westbound lane on Eglinton Ave will be occupied between Blackthorne Ave and Gabian Way while this work takes place. Concrete trucks will be entering and exiting the workzone. Motorists can expect delays when travelling through the intersection.

 

TRAFFIC IMPACTS

  • One westbound lane on Eglinton Ave will be occupied between Blackthorne Ave and Gabian Way.
  • No impacts to TTC bus service.

 

PEDESTRIAN IMPACTS

  • Periodic sidewalk interruptions – pedestrians will be rerouted to temporary sidewalk
  • All crosswalks will be maintained.
  • All TTC bus stops will remain in their current locations

 

HOURS OF WORK

  • Friday August 7, 2020
  • Lane reductions will begin at approximately 6:00am and last for approximately 12 hours.
  • The contractor may not always work during permitted hours but may do so at its discretion.
  • Work may be rescheduled due to weather conditions or unforeseen circumstances.
  • This work may be longer or shorter than expected.

 

OTHER IMPACTS

  • Minimal noise from construction equipment such as concrete trucks and construction vehicles.