Laneway Closure during Concrete Pour at Forest Hill Station - August 26, 2020
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
August 25, 2020
What Work is Taking Place?
A concrete pour will take place at Forest Hill Station on August 26, 2020 starting as early as 11:00 a.m. for approximately five (5) hours. The concrete will form the station's invert slab underground. The invert slab will flatten the bottom of the tunnel so that track can eventually be laid.
What to Expect
Concrete pumps will be placed within work zones and several concrete trucks will deliver concrete to the site each hour. To allow for continuous turning of the mixer and discharging of concrete, concrete trucks must remain running. Noise from construction can be expected.
HOURS OF WORK
- August 26, 2020
- Concrete pour will begin as early as 11:00 a.m. for approximately five (5) hours
- Work may be rescheduled due to inclement weather or unforeseen circumstances
TRAFFIC IMPACTS
- Concrete trucks will stage within work zones
- The Hilltop-Bathurst laneway remains closed to vehicular through-traffic through 2020
- No change to the existing traffic configuration is required
- Travel delays are expected with the Crosstown construction, please allow extra time for your journey
- Traffic will be extra heavy at peak periods during the Crosstown construction; when possible, please travel during the off-peak period between 10 a.m. and 3 p.m.
PEDESTRIAN IMPACTS
- The Hilltop-Bathurst laneway will be closed to pedestrian through-traffic while this work takes place
- Pedestrian travelling on the north side of Eglinton Avenue West should proceed to Wembley Rd for through-access between Hilltop Rd and Bathurst St
- The sidewalk on the north side of Eglinton Avenue West remains open on either side of the Secondary Entrance
Sign up for e-mail updates at www.thecrosstown.ca/sign-up