Lebovic Avenue

Looking for updates near a specific intersection?

Choose an intersection from the drop down list to view all of the latest news and construction updates in that area. Intersections are listed from west to east with Eglinton as the main cross-street.




Syndicate content
 
September 062016

Pedestrian Safety near Construction Sites

Construction of the Eglinton Crosstown LRT line, including 15 underground stations, is underway. Since the end of school, many construction sites have been set up for station construction and the set-up of some major intersections along Eglinton Avenue has been changed.

Pedestrian Information Read more »

August 252016

Subsurface Utility Engineering (SUE) Investigation on Eglinton Avenue East for Future At-Grade Stops

What work is taking place? 

  • As preparatory works continue for future at-grade stops, crews will begin utility investigation work to determine the location and depth of existing utilities along Eglinton Avenue East between Victoria Park Avenue and Birchmount Road

What to Expect Read more »

May 092016

Update: Geotechnical Works continue along Eglinton Avenue East

What work is starting?

In February 2016, crews began conducting preparatory activities in the Eglinton Avenue East vicinity to make way for the future Eglinton Crosstown LRT. 

Upcoming works – geotechnical testing   Read more »

March 222016

Subsurface Utility Engineering (SUE) Investigation along Eglinton Avenue East

What work is taking place? 

  • As preparatory work for the future at-grade stops continues, crews will be conducting SUE investigations along Eglinton Avenue East to determine the location and depth of existing utilities.
  • Working westward from Ionview Road to Victoria Park Road, crews will drill and use a vacuum truck overtop of existing utilities within the boulevard and roadway, then a surveyor will examine the utilities to obtain coordinates for design purposes.

When Read more »

January 192016

Eglinton Crosstown Year-In-Review

The Crosstown team appreciates the patience of our neighbours and local businesses while we work to build new rapid transit. In 2015, the project made significant progress and hit a number of key milestones. We would like to take this opportunity to reflect on the past year and provide a look ahead to how we expect the project to progress in 2016. Read more »