Monitoring Equipment Installation along Eglinton Avenue West from Warren Road to Castle Knock Avenue
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
What: Monitoring equipment continues to be installed along Eglinton Avenue West. This equipment will measure important data related to the work of our tunnel boring machines underground. These measurements will allow construction crews to adjust tunnelling activities along Eglinton Avenue West if needed.
Where: The equipment will continue to be installed within the roadway along Eglinton Avenue West from Warren Road to Castle Knock Avenue. While this equipment is being installed, crews will be working within one lane of traffic with rolling lane closures to drill and install monitoring equipment.
When: Tuesday, January 5 to Thursday, January 7 2016, beginning at 7:00 a.m. and to be complete by 5:00 p.m.
Traffic Details
- Traffic will be reduced to one lane in each direction near the work zone and temporary lane closures will be required to allow crews to perform work safely
- Traffic will be diverted around the work zone, separated by traffic cones
- There will be no street parking near the affected areas during this time.
Pedestrians:
Pedestrians will not be affected by this work. Access to all stores and businesses in the area will remain open during this installation. As always, please take care when travelling near construction areas.
Work Hours
This work will be carried out between 7:00 a.m. and 5:00 p.m. Efforts will be made to expedite the work as much as possible.
Please Contact Us