OCS Cable Installations on Eglinton Avenue East between Laird Drive and Leslie Street

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
June 20, 2021

 

OCS Cable Installations on Eglinton Avenue East between Laird Drive and Leslie Street

What Work is Taking Place?

Crews will be installing OCS (Overhead Catenary System) cables beneath Eglinton Avenue East between Laird Drive and Leslie Street. Overhead catenary is the system installed above the rails of a light rail system, to provide operational power to the LRVs (Light Rail Vehicles). Installation will take place on Sunday June 20, 2021, between the hours of 7:00 a.m. and 4:00 p.m. Crews will operate above the track. No significant traffic impacts are expected, while this work takes place.


What to Expect

Cables will be installed overhead using a high rail vehicle. Minimal noise is expected while this work takes place. Site lighting will be required.

HOURS OF WORK

  • Sunday June 20, 2021
  • Work is expected to take place between 7:00 a.m. - 4:00 p.m.
  • This work may be rescheduled due to inclement weather or unforeseen circumstances.

TRAFFIC AND PEDESTRIAN DETAILS

  • No changes to the current traffic configurations or pedestrian routes are expected, as a result of this work.
  • Short-term lane interruptions may be required as vehicles enter and exit the work zones.
  • Traffic control personnel will be present, while this work takes place.

TTC DETAILS

  • Access to TTC will be maintained at all times.
  • For more information, please visit www.ttc.ca