Online Consultation: Allen-Eglinton Station South Entrance Options

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
April 2, 2012

Please note that the Allen-Eglinton Station South Entrance consultation is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the Consultation Report (PDF) for the Allen-Eglinton Station South Entrance consultation.

Next steps

  • The next Open House for Allen Road-Eglinton West will be scheduled in early summer, 2012.
  • A final decision on a south side entrance will be made over the coming months based on several factors including cost/overall project budget, community input and engineering factors.

South Entrance Consultation Presentation
At the preliminary Eglinton West/Allen Road station design Open House on February 2nd, 2012 and in the online consultation, local residents highlighted their preference for a south-side station entrance to access the future Eglinton-Crosstown. As a result, the project team prepared preliminary design options for a potential south entrance and invited comments from the local community.

If you would like to view the presentation in full screen press the Icon to expand presentation in the bottom-right corner.  If you cannot view the presentation below, read the text summary.

Download the presentation in PDF format