Preparatory Road Works on Eglinton Avenue East for Surface Stops
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Preparatory Road Works on Eglinton Avenue East for Surface Stops
The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.
Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located.
Lane reductions will be required. New turning restrictions may be implemented at intersections along Eglinton and other nearby intersections. Pedestrians may be rerouted through temporary pedestrian walkways. Additionally, TTC bus stops may be relocated to ensure the safety of passengers accessing transit is maintained.
What Work is Taking Place?
- Crews will be conducting preparatory work in the roadway to prepare Eglinton and nearby roads for the future changes.
Timing
- Work may begin as early as June 2017.
- Work may be rescheduled due to weather conditions or unforeseen circumstances.
What to Expect
- Nearby residents and businesses can expect to hear noise related to drilling, saw-cutting, and the use of heavy equipment.
- Paid Duty Police Officers will be present when work is in close proximity to intersections.
For more information, please contact Brittany at the East Community Office.
Thank you for your patience as we work to build this important project.
Please support your local businesses during construction.
Sign up at www.thecrosstown.ca/sign-up to receive regular email updates.