Public Engagement

Looking for updates near a specific intersection?

Choose an intersection from the drop down list to view all of the latest news and construction updates in that area. Intersections are listed from west to east with Eglinton as the main cross-street.




Syndicate content
 
October 072013

City of Toronto Eglinton Connects Planning Study

The City of Toronto is hosting a series of meetings to present the results of the Eglinton Connects planning study. These meetings will be held on October 7th, 8th and 9th at locations across the corridor.

Some of the recommendations to be presented include: Read more »

July 192013

Eglinton Crosstown Update

On Wednesday June 19th, The Crosstown team hosted a meeting at Beth Shalom Synagogue for information on construction works related to the Eglinton Crosstown LRT project. The open house was an opportunity to view displays and speak one-on-one with staff. Read more »

Categories:
June 182013

Join us at our open house for an Eglinton Crosstown Update

You're invited you to attend a meeting for information on construction works related to the Eglinton Crosstown LRT project. The open house will begin at 7:00 p.m. with an opportunity to view displays and speak one-on-one with staff. We look forward to seeing you there. Read more »

Categories:
April 102013

Mount Dennis Mobility Hub Update and Station Design Review

The Mount Dennis Mobility Hub Update and Station Design Review workshop is now closed. Thank you to everyone who attended the open house or submitted their comments online. 

The purpose of the presentation was to present a preliminary station design concept and a series of more refined concepts for how the lands around the station could develop over time. You can view the full presentation below. Read more »

Categories:
February 282013

Central Station Reference Concept Design Online Consultation

The online consultation for the Central Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

Categories:
February 262013

Functional Design Presentation At-Grade Section: Don Mills to Ionview Online Consultation

The online consultation for the Functional Design Presentation At-Grade Section: Don Mills to Ionview is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

Categories:
February 192013

West Station Reference Concept Design Online Consultation

The online consultation for the West Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

Categories:
February 082013

Designing the Future of Eglinton: Public Workshops

We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.

Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »

Categories:
January 212013

Environmental Assessment Update: East Tunnel Alignment

Metrolinx invites you to attend a follow-up meeting on the east tunnel extension to just east of Don Mills Station. A public meeting was held in December to provide a project update, to present proposed changes to the tunnel alignment, and to receive input from the public on those changes. Now, Metrolinx wants to share the input received and discuss next steps. Read more »

Categories:
January 032013

Laird Drive to Don Valley Parkway Environmental Assessment Online Consultation Update

Metrolinx is undertaking an amendment to the Eglinton Crosstown LRT Environmental Assessment (EA). Including a change in the east tunnel launch location from east of Laird Station (near Brentcliffe Road) to just east of Don Mills Station. Read more »

Categories: