Road Restoration from Rosemount Drive to Ionview Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
May 14, 2021
What Work is Taking Place?
Beginning Friday May 14, 2021, crews will perform road restoration activities along Eglinton Avenue East between Rosemount Drive and Ionview Road. Partial driveway closures will be required to facilitate this work. Affected properties will be notified directly. Please carefully review ‘Driveway Closure Details’ and ‘What to Expect’.
Driveway Closure Details
- A partial driveway closure will be required at each of the following properties:
- 2283 Eglinton Avenue East (3 driveways)
- 2293 Eglinton Avenue East (1 driveway)
- 2303 Eglinton Avenue East (2 driveways)
- Driveway closures will begin with the most westerly driveway at 2283 Eglinton Ave E and continue eastward until the work is complete
- Each driveway closure is expected to last for one (1) working day
- One half of the driveway will be closed at a time to maintain vehicle access with assistance from traffic control personnel
What to Expect
Noise from road restoration activities, including removal of asphalt, installation of sub drains, and asphalt work can be expected. Pedestrians will be rerouted around the work zone. Motorists may experience delays with traveling through the affected areas.
HOURS OF WORK
- Driveway closures will take place between Friday May 14 and Friday May 21, 2021.
- Road restoration work will take place 6:30 a.m. – 6:00 p.m. Monday - Friday
- Work may be rescheduled due to inclement weather or unforeseen circumstances
- Work may take longer or shorter than expected
TRAFFIC DETAILS
- Partial driveway closures will be in effect at 2283, 2293 and 2303 Eglinton Ave E
- Vehicle access will be maintained with assistance from traffic control personnel
- All other existing traffic conditions will remain in effect
PEDESTRIAN DETAILS
- Pedestrians will be rerouted around the work zone
Disponible en français
Categories: