SHELTER INSTALLATION AT WYNFORD STOP, July 15, 2020

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
July 15, 2020

What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will install permanent shelters at the Wynford Stop north platform. Installation will begin as early as July 15, 2020 for approximately three (3) days. Lane closures will be required for this work. 

Hours of Work
• Shelter installation will begin as early as July 15, 2020 for approximately three (3) days.
• Work may be performed between the hours of 7:00 a.m. and 11:00 p.m.
• Work may be rescheduled due to weather conditions or unforeseen circumstances.

Work Area Map
 work area map

What To Expect
• A crane will be in installed within the existing guideway work zone to facilitate shelter installation.
• The shelter structures will be delivered to the work zone to be lifted into place by the crane.
• Concrete works and glazing will also take place within the work zone.
• Noise and lighting from construction equipment and vehicles can be expected.

Traffic And Pedestrian Details
• Westbound traffic will be limited to one lane at the shelter installation work zone.
• A minimum of one lane in each direction will be maintained during this work.
• No changes to existing pedestrian routes.
• Access for emergency services will be maintained at all times.

TTC Details
• All temporary TTC bus stops will remain in their current locations.
• Relocation and re-routing of bus stops and buses is done in consultation with TTC to ensure construction can continue safely, while minimizing impact on the community and customers.

Travelling Smart during Construction
Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.
Stay Informed
Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
Disponible en français.

Categories: