Subsurface Utility Engineering (SUE) Investigations at Bayview and Eglinton
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
July 13, 2016
What Work is Taking Place?
- To prepare for future construction of the Leaside Station, crews will be conducting Subsurface Utility Engineering investigations along Eglinton Avenue East to determine the location and depth of existing utilities.
- Crews will drill and use a vacuum truck overtop of existing utilities within the boulevard and roadway, then a surveyor will examine the utilities to obtain coordinates for design purposes.
Timing
- SUE investigation will begin as early as July 25th, 2016, and will take approximately one (1) week to complete.
- Work is permitted between the hours of 9:00 AM and 4:00 PM.
What to Expect
- Residents and businesses near the future Leaside Station will see heavy trucks and equipment in the area as crews move from one test hole to the next.
- While this work is underway, nearby residents and businesses can expect to hear some noise related to the use of vacuum trucks and heavy equipment.
Traffic & Pedestrian Details
- Intermittent lane closures will be required along Bayview Avenue, north and south of Eglinton Avenue, and on Eglinton Avenue, from Mann Ave to east of Bayview Avenue.
- All pedestrian routes remain open.
Thank you for your patience as we work to build this important project