August 18, 2020

 

Upcoming Concrete Pours at Chaplin Station Tertiary Entrance August 2020

What Work is Taking Place?

Two more concrete pours will take place at the Chaplin Station Tertiary Entrance site in August 2020. The concrete will form walls in the station’s concourse level. A concrete pump will be placed within the work zone on the south side of Eglinton Avenue West, west of Russell Hill Road and several concrete trucks will deliver concrete to the site each hour. Each pour will take approximately five (5) to 14 hours to complete.

What to Expect

Noise from construction activity, including concrete trucks, concrete pumps and a crane can be expected. Several concrete trucks will enter and exit the work zone each hour. Please note that concrete trucks must remain running to allow for continuous turning of the mixer and to discharge concrete. Please review the traffic and transit details below.

HOURS OF WORK

  • Concrete pours are scheduled for the following dates, beginning as early as 5:00 a.m. for five (5) – 12 hours:
    • Wednesday August 19, 2020
    • Friday August 21, 2020
  • This activity is weather-dependent and may be rescheduled in the event of inclement weather or unforeseen circumstances

TRAFFIC DETAILS

  • Traffic control personnel will be present to assist with truck entry and egress
  • There is no change to the current traffic configuration associated with this work
  • Travel delays are expected with the Crosstown construction. Please allow extra time for your journey.
  • Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.

PEDESTRIAN DETAILS

  • There is no change to the current pedestrian routing associated with this work

TRANSIT INFORMATION

  • No changes to TTC for this work
  • For TTC information, visit www.ttc.ca 