Upcoming Guideway Work at Hakimi & Lebovic Avenue
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
What Work is Taking Place?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be continuing guideway work in the center of Eglinton Avenue East between Victoria Park Avenue and Ionview Road throughout 2019. Guideway work in the Hakimi Lebovic intersection will start as early as June 10, 2019 for approximately six (6) weeks. During this work, no through traffic will be permitted through the Hakimi-Lebovic Intersection. East-West through traffic will be maintained along Eglinton Avenue East.
The work includes cutting and removal of existing asphalt, excavation, installation of subgrade materials, duct bank installation and track drainage, track slab and stops.
Hours of Work
- Work is expected to start as early as Monday June 10, 2019 and last for approximately six (6) weeks.
- Time: guideway work will be performed between the hours of 7 am and 11pm.
- Work may be delayed due to weather conditions or unforeseen circumstances.
What to Expect
- Cutting and removal of existing asphalt in the center of Eglinton Avenue East
- The work will be performed within a protected work zone.
- Eglinton Avenue East remains open in both directions at all times.
- No through north/south traffic at the intersection during the duration of this work.
- Nearby businesses and residents can expect noise from excavators, bobcats, trucks and other construction equipment caused by utilities relocation activity.
- Pedestrians and road users can expect delays when travelling through the work zone.
- As always, please take care when travelling near work sites.
Traffic, Pedestrian and TTC Impacts
- A minimum of two (2) lanes of eastbound and west bound through traffic will be maintained during this work.
- Left turn restrictions at the intersection during this work.
- Alternating north-south crosswalk closure during this work. One north-south crosswalk will remain open at all times.
- Emergency services access will be maintained.
- Pedestrian access will be maintained.
- Relocation and re-routing of bus stops and buses respectively, is done in consultation with TTC to ensure construction can continue safely while minimizing impact on the community and customers.