Update: Gantry Crane Removal at Avenue Station - August 9-19, 2021
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
*Information updated on July 30, 2021*
What Work is Taking Place?
As early as Monday August 9, 2021, crews at Avenue Station will begin to disassemble and remove the overhead gantry crane (depicted above) located at the Main Entrance site, west of Avenue Road. Disassembly and removal of the gantry crane is expected to take place Monday through Saturday, on a 24-hour basis, for approximately 10 days.
To facilitate this work safely, westbound traffic on Eglinton Avenue West will be reduced to one lane at the Main Entrance. Lane reductions are not expected to be performed daily, only when required. For more information, please review the complete notice.
What to Expect
Use of a mobile crane and telescopic boom lift to remove and load the gantry crane pieces onto transport trucks is required. Short-term traffic interruptions can be expected, while trucks enter and exit the work zone. Expect delays while travelling through the intersection. Noise from construction activities, including truck traffic, crane movements and material loading, can be expected. Occasionally, use of a jackhammer will be required to break away the concrete footings of the gantry crane. Traffic control personnel and/or a Paid Duty Officer will be present, while this work takes place.
HOURS OF WORK
- As early as Monday August 9, 2021 for approximately 10 days
- This work is expected to take place Monday through Saturday on a 24-hour basis
- Work may be delayed or rescheduled due to inclement weather or unforeseen circumstances
TRAFFIC DETAILS
- Periodically, westbound traffic on Eglinton Avenue will be reduced to one lane at the Main Entrance
PEDESTRIAN DETAILS
- No changes to the current pedestrian routes are expected as a result of this work
TRANSIT INFORMATION
- Access to TTC will be maintained at all times