UPDATE: Overnight Crosswalk Removal and Re-Painting at Leaside Station

Looking for updates near a specific intersection?

Choose an intersection from the drop down list to view all of the latest news and construction updates in that area. Intersections are listed from west to east with Eglinton as the main cross-street.

 
August 7, 2017

What Work is Taking Place?

Leaside station is required to do a refresh to the existing crosswalk painting at the Bayview Ave and Eglinton Ave E intersection. Due to the volumes of traffic in the area and existing construction set up reducing available lanes, these works will be completed overnight. 

In an effort to mitigate noise where possible, CTS has installed a broadband back up alarm on the vehicle that will be used rather than the usual tonal alarm, which will greatly reduce the spread of the sound while maintaining safety. 

Timing 
  • Work is expected to take 3 hours plus set-up and take-down before and after the work.   
  • Work will occur during one (1) overnight period (11 p.m. and 7 a.m.) on August 11 (Friday night to Saturday morning).
  • Work may be rescheduled due to weather conditions or unforeseen circumstances.

Stay Informed

Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

For more information, please contact Nicole DiCarlo at the East Community Office.

Thank you for your patience as we work to build this important project.

 Please support your local businesses during construction.