May 31 2019

Construction Notice: Street Light Installation between Rosemount Drive and Ionview Road

Street Light Installations

Rosemount Drive & Ionview Road

What Work is Taking Place? Read more »

May 31 2019

Paving Work at Mount Pleasant Station Week of June 3, 2019

What Work is Taking Place?

As early as June 3, crews will pave the area of Eglinton Avenue between Brownlow Avenue and Mt Pleasant Road, where hydro work was completed the previous week.  Eglinton Avenue will be reduced to one lane only, alternating traffic in each direction, for approximately one (1) hour while this work takes place.

Hours of Work Read more »

May 30 2019

Overnight Utilities Relocations at Eglinton Avenue East and Wynford Drive

Overnight Utilities Relocations at Eglinton Avenue East and Wynford Drive 

WHAT WORK IS TAKING PLACE? Read more »

May 30 2019

Weekend Traffic Restrictions at Hakimi and Lebovic Avenue - June 1-2 & June 8-9

Originally Posted: May 23, 2019 

Updated: May 30, 2019 

What Work is Taking Place? Read more »

May 29 2019

Overnight Concrete Pour at Fairbank Station - May 30, 2019

What Work is Taking Place?

On Thursday May 30th, crews will perform a 650m3 concrete pour at Fairbank Station. The concrete will form the base of the second level concourse at the main entrance. Concrete pumps will be placed in the work zone, and concrete trucks will queue in the southbound lane of Dufferin Street between Eglinton Avenue West and Hunter Street as well as the west curb lane of Vaughan Road. Dufferin Street and Eglinton Avenue West will remain open while this work takes place.  Read more »

May 29 2019

Updated: Construction Begins for Traction Power Substation 12

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will be commencing construction of the Traction Power Substation (TPSS) 12 that will power the Eglinton Crosstown Light Rail Transit (ECLRT) line. The work will take place in a fenced work zone located on the north east side of Birchmount Road in close proximity to Toronto Police Service 41 Station. Read more »

May 29 2019
May 29 2019

Updated Traffic Configuration at Swift/Credit Union Drives and Eglinton Avenue East

Updated Traffic Configuration at Swift/Credit Union Drives and

Eglinton Avenue East

  Read more »

May 28 2019

ROAD WIDENING AND PAVING AT SLOANE AVENUE AND EGLINTON AVENUE EAST

WHAT WORK IS TAKING PLACE?

Throughout 2019, Eglinton Crosstown LRT construction will require temporary changes to intersection operations from Credit Union to Ionview for road paving and guideway construction. This work is required for the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East. Read more »