Update: Overnight Watermain Investigations for Laird Station

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
August 4, 2017

What Work is Happening?

To prepare for upcoming mining works at Laird Station, a careful inspection of watermains in the area is required. 

Crews will complete water leakage detection for the watermains on Eglinton Avenue East between Sutherland Drive and Brentcliffe Road. The scope of work includes testing watermains and associated fittings on Eglinton and 10 meters north/south of Eglinton. 

Testing will be done in 1-2 metre intervals using acoustical equipment called Electronic Ground Microphones and Acoustic Signal Level Meters (see photo). These pieces of equipment will be visible to the public during testing, but they do not emit noise.

A small traffic control set up and a Paid Duty Officer will be on site as crews move from area to area along testing the required areas.

Hours of Work

  • Work is required for one night on Tuesday, August 8 (10pm to 7am).
  • Timelines are subject to change due to weather and unforeseen circumstances.


 

 

For more information about this work, please contact:

Heather Glicksman at 416-482-7411 or crosstown@metrolinx.com

 

Thank you for your patience as we work to build this important project.

Please support your local businesses during construction.

Sign up at www.thecrosstown.ca/sign-up now to receive regular email updates