UPDATED: Dewatering System at Avenue Station
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Updates: September 8, 2017
Latest Issue Date: May 15, 2017
Original Issue Date: April 17, 2017
What Work is Happening?
The term “dewatering” means pumping from the ground water at a site where there will be excavation. At Eglinton Avenue West and Avenue Road, dozens of small wells will be drilled around the entire station box where excavation will be taking place. The volume of soil that requires dewatering is significant. 72 wells will be drilled approximately every 10 metres and shallow trenches will be required to lay the pipes, pumps, wells and valves to do the work. The drills installing the wells and the trenches for the piping will encircle the station box.
Work commenced in late May 2017.
- Drilling and trenching will occur between 7:00 a.m. to 11 p.m.
- Equipment will remain in place after the rig has finished for the day. This approach will expedite the work and ensure it continues to move around the zone efficiently.
- The entire installation will take approximately five months.
- Equipment is expected to change position approximately every 3 days.
- * Timelines are subject to change due to weather and unforeseen circumstances.
- Pedestrian access will be maintained at all times.
- Lane reductions will be in place on Eglinton Avenue West in the vicinity of the construction zone.
- Some on-street parking spaces will be impacted.
- Any work required in Eglinton Park will be coordinated with appropriate authorities.
^ Photo of well installation drill rig.
^ Photo of trenching process to connect wells.
Stay Informed
- Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
Contact Us
- If you would like more detail about this work or any other aspect of the Eglinton Crosstown project, please contact Brittany Maxwell at the West Community Office at (416) 782-8118.